- Created plans/ directory for long-term training phase planning - First plan: wrist-friendly-reboot.md — 3-phase reintroduction (tendon adaptation → progressive loading → strength building) - Agent config updated to read plans/ before designing workouts - Analysis sections updated to reference the plan file - All existing workout Analysis sections now link to plans/wrist-friendly-reboot.md
3.1 KiB
3.1 KiB
Plan: Wrist-Friendly Reboot
Started: 2026-06-25 Context: Returning after multi-month layoff + distal radius fracture (5/16/2026, 5.5 weeks post-op at start). Left hamstring glute-referral pattern emerged Day 1.
Overview
Three-phase reintroduction — prioritize connective tissue adaptation, re-establish motor patterns, then build strength. Each phase has a minimum duration; progress only when the current phase is tolerated pain-free.
Phases
Phase 1: Tendon Adaptation & Reintroduction (Weeks 1-4)
~Jun 25 – Jul 23
| Element | Guideline |
|---|---|
| Intensity | RPE 6-7, sub-50% estimated 1RM |
| ROM | Mid-range only. Avoid end-range (stretch at bottom/top of any movement) |
| Volume | Maintenance zone (4-6 sets/muscle group/week) |
| Key constraints | No deep squat, no push-ups, no ab roller, no heavy grip. Landmine/band press for pushing. Dead bugs for core. Straps on all pulls. |
| Legs currently | Hamstring rest until pain-free at rest. Then re-introduce via glute-emphasis warm-up + mid-range movements (hip thrusts, step-ups, heels-elevated squats). |
| Wrist | No barbell bench/OHP. Neutral-grip or band variations. Grip work done separately in PT (3x/day). |
| Progress trigger | All sessions pain-free for 1 week, with normal next-day recovery |
Phase 2: Progressive Loading (Weeks 4-8)
~Jul 23 – Aug 20
| Element | Guideline |
|---|---|
| Intensity | RPE 7-8, 60-75% estimated 1RM |
| ROM | Gradually reintroduce full ROM over the phase |
| Volume | Minimum effective to maximum adaptive (8-12 sets/muscle group/week) |
| Key changes | Reintroduce barbell bench and OHP (landmine or dumbbell variants if wrist still issues). Full squat depth as tolerated. Begin direct hamstring work (RDLs from blocks, Nordic curls at partial ROM). |
| Grip | Reassess weekly. Add farmer's carries, dead hangs once wrist PT clears it. |
| Progress trigger | All exercises at full ROM, no pain, normal recovery |
Phase 3: Strength Building (Weeks 8+)
~Aug 20 onward
| Element | Guideline |
|---|---|
| Intensity | RPE 8-9, 75-85% training max |
| ROM | Full ROM on all lifts |
| Volume | Maximum adaptive (12-18 sets/muscle group/week) |
| Key changes | Transition to Juggernaut or structured program. Main lifts: squat, bench (if wrist ready), deadlift, OHP. |
| Conditioning | Trail runs/hikes, jump rope, BikeErg intervals. |
Current Status
As of 2026-06-29 (Monday): Week 2 of Phase 1
- 2 upper body sessions completed (pain-free)
- 1 full body session completed (hamstring triggered, now resolved)
- Hamstring: very mild discomfort on Sat, feeling ~100% today. Leg re-intro planned today with glute-emphasis warm-up.
- Wrist: band press works great. Landmine press causes ulnar compression pain. Grip work in PT 3x/day.
References to Agent Config
reintroduction period (weeks 1-4)guideline in agent config maps to Phase 1left hand grip limitationguideline applies through Phase 1 and into Phase 2- Check-in on grip progression: early this week (Mon/Tue)
- Hamstring rehab: glute activation pattern, not tendinopathy